Launching the scale of investment in Tan Huong infrastructure Nhut Thanh Tan is a typical investment-attracting enterprise of Tien Giang province. Tan Huong infrastructure (industrial park) was established based on document No. 1517/ttg of government leaders dated September 26, 2006. Up to now, Tan Huong infrastructure has completed nearly 95% of the foundation schedule on a total area of nearly 200 hectares with a total investment of more than 547 billion VND.
In addition to Tan Huong infrastructure in Tien Giang province, Nhut Thanh Tan Co., Ltd. is also the project owner implementing large-scale investment in An Ha infrastructure in Pham Van Hai commune, Binh Chanh district, Ho Chi Minh City. bright. Ho Chi Minh.
Investor: Hoang Quan Group
Address: In Tan Huong Industrial Park, Chau Thanh, Tien Giang
Total area: 6.05 hectares
Reasons for deciding the scale of investment in Tan Huong infrastructure Tan Huong infrastructure was spent with the goal of stimulating the economy of Tien Giang province to increase, creating technical breakthroughs and many diverse results. , rich in variety. Operated in 2007, after more than 13 years, this is still an important industrial park in the area.
These industrial zones will attract shareholders to create manufacturing factories, along with creating jobs for many workers, creating a large input for the region's budget to participate in promoting community economic growth of the country. Tien Giang province in particular and the country in general.
Location of TAN HUONG INDUSTRIAL PARK project
Location of Tan Huong infrastructure investment scale
Exact area: Tan Huong commune, Chau Thanh district, Tien Giang province
Demarcation and framework for setting up specific arrangements for Tan Huong infrastructure
Southeast, 150 m from National Highway 1a
West is 866: 1, 500 m from provincial road
The south borders Lien Tan Highway
North - northeast, 150 m from Huong Highway 18
Facilities in the area of Tan Huong infrastructure investment scale
The road in the infrastructure is 16m wide, the row of trees in the middle is 3m, the trees on both sides of the walkway are 15m wide, 4 lanes.
Electricity is brought from the 22kv power line
Criteria for water treatment workshop: microbiological treatment meets column A TCVN 40: 2011/BTNMT, largest processing capacity at the present time 4, 500m3/day
Current wastewater treatment capacity: 4, 500m3/day
Fire-fighting water columns are installed along the roads in the industrial park, each 150m apart
Internet: fiber optic cable (vnpt and viettel)
The chain of green trees covers 20% of the total area of the industrial park
External amenities of Tan Huong infrastructure investment scale
The infrastructure is located in the important southern economic region and this is the traffic clue between the large western region and the nation's most economic capital, Saigon.
Far from city center. Saigon 50km
Far from Saigon. My tho is twelve kilometers southwest
About 45km from Hiep Phuoc port
About 43km from Tan Son Nhat airport
Category | Detail | |
---|---|---|
OVERVIEW: | ||
Infrastructure investor | THANH TAN PLASTIC COMPANY LIMITED | |
Location | Tan Huong commune, Chau Thanh district, Tien Giang province | |
Acreage | total area | 197,33 ha |
Factory land area | ||
Vacant area | ||
Ratio of green trees | ||
Operating time | 50 years | |
Current investors | LONG JI COMPANY LIMITED, TEX – GIANG JOINT STOCK COMPANY, HIGASHIMARU VIETNAM COMPANY LIMITED | |
Main job | Electricity, electronics, refrigeration, assembly of electronic and telecommunications equipment systems; Mechanical and assembly industries. wood production, high-end handicrafts, pharmaceutical production, cosmetic chemicals, optical instruments, medical equipment; Agricultural, product, food and beverage processing industries | |
Occupancy | 1 | |
LOCATION & DISTANCE: | ||
Road | to Ho Chi Minh city: 50km | |
Air | To Tan San Nhat Airport:56km | |
Train | yes | |
Sea port | to Saigon Sea Port 35km | |
INFRASTRUCTURE: | ||
Geological | Hard soil: 1,5-2,5kg/cm2 | |
Internal traffic | Main road | Number of lane: 4 lanes |
Secondary branch road | Number of lane: 2 lanes | |
Electricity supply | Voltage | Power line: 110/22KV |
Source capacity | 40MVA | |
Clean water | Wattage | 15.000m3/day |
Công suất cao nhất | ||
Hệ thống xử lý nước thải | Công suất | 10.000m3/day |
Internet và viễn thông | ADSL, Fireber & Telephone line 4000 lines | |
LEASING PRICE: | ||
Land | Land rents | 60-80 USD |
Rental term | 50 years | |
Type/Class | Level A | |
Payment methods | 12 months | |
Deposit | 0.1 | |
Minimum area | 1ha | |
Workshop | 3 | |
Management fee | Management fee | 0.4 USD/m2 |
Payment methods | yearly | |
Electricity price | Peak | 0.1 USD |
Normal | 0.05 USD | |
Idle | 0.03 USD | |
Payment methods | Monthly | |
Supplier | EVN | |
Price of clean water | Water price | 0.4 USD/m3 |
Payment methods | Monthly | |
Water supplier | Charged by Gov. suppliers | |
Wastewater fee | Price | 0.28 USD/m3 |
Payment methods | Monthly | |
Water quality before treatment | Level B | |
Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
Other fees | Yes |