TAN HUONG INDUSTRIAL PARK - TIEN GIANG

OVERVIEW OF TAN HUONG INDUSTRIAL PARK - TIEN GIANG Launching the scale of investment in Tan Huong infrastructure Nhut Thanh Tan is a typical investment-attracting enterprise of Tien Giang province.

OVERVIEW OF TAN HUONG INDUSTRIAL PARK - TIEN GIANG

Launching the scale of investment in Tan Huong infrastructure Nhut Thanh Tan is a typical investment-attracting enterprise of Tien Giang province. Tan Huong infrastructure (industrial park) was established based on document No. 1517/ttg of government leaders dated September 26, 2006. Up to now, Tan Huong infrastructure has completed nearly 95% of the foundation schedule on a total area of nearly 200 hectares with a total investment of more than 547 billion VND.

In addition to Tan Huong infrastructure in Tien Giang province, Nhut Thanh Tan Co., Ltd. is also the project owner implementing large-scale investment in An Ha infrastructure in Pham Van Hai commune, Binh Chanh district, Ho Chi Minh City. bright. Ho Chi Minh.
Investor: Hoang Quan Group

Address: In Tan Huong Industrial Park, Chau Thanh, Tien Giang

Total area: 6.05 hectares

Reasons for deciding the scale of investment in Tan Huong infrastructure Tan Huong infrastructure was spent with the goal of stimulating the economy of Tien Giang province to increase, creating technical breakthroughs and many diverse results. , rich in variety. Operated in 2007, after more than 13 years, this is still an important industrial park in the area.
These industrial zones will attract shareholders to create manufacturing factories, along with creating jobs for many workers, creating a large input for the region's budget to participate in promoting community economic growth of the country. Tien Giang province in particular and the country in general.

Location of TAN HUONG INDUSTRIAL PARK project
Location of Tan Huong infrastructure investment scale

Exact area: Tan Huong commune, Chau Thanh district, Tien Giang province

Demarcation and framework for setting up specific arrangements for Tan Huong infrastructure

Southeast, 150 m from National Highway 1a

West is 866: 1, 500 m from provincial road

The south borders Lien Tan Highway

North - northeast, 150 m from Huong Highway 18

Internal amenities of the TAN HUONG INDUSTRIAL PARK project

Facilities in the area of Tan Huong infrastructure investment scale

The road in the infrastructure is 16m wide, the row of trees in the middle is 3m, the trees on both sides of the walkway are 15m wide, 4 lanes.

Electricity is brought from the 22kv power line

Criteria for water treatment workshop: microbiological treatment meets column A TCVN 40: 2011/BTNMT, largest processing capacity at the present time 4, 500m3/day

Current wastewater treatment capacity: 4, 500m3/day

Fire-fighting water columns are installed along the roads in the industrial park, each 150m apart

Internet: fiber optic cable (vnpt and viettel)

The chain of green trees covers 20% of the total area of the industrial park

External amenities of the project

External amenities of Tan Huong infrastructure investment scale

The infrastructure is located in the important southern economic region and this is the traffic clue between the large western region and the nation's most economic capital, Saigon.

Far from city center. Saigon 50km

Far from Saigon. My tho is twelve kilometers southwest

About 45km from Hiep Phuoc port

About 43km from Tan Son Nhat airport

Category Detail
OVERVIEW: 
Infrastructure investor THANH TAN PLASTIC COMPANY LIMITED
Location Tan Huong commune, Chau Thanh district, Tien Giang province
Acreage total area 197,33 ha
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 50 years
Current investors LONG JI COMPANY LIMITED, TEX – GIANG JOINT STOCK COMPANY, HIGASHIMARU VIETNAM COMPANY LIMITED
Main job Electricity, electronics, refrigeration, assembly of electronic and telecommunications equipment systems; Mechanical and assembly industries. wood production, high-end handicrafts, pharmaceutical production, cosmetic chemicals, optical instruments, medical equipment; Agricultural, product, food and beverage processing industries
Occupancy 1
LOCATION & DISTANCE: 
Road to Ho Chi Minh city: 50km
Air To Tan San Nhat Airport:56km
Train yes
Sea port to Saigon Sea Port 35km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Number of lane: 4 lanes
Secondary branch road Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 40MVA
Clean water Wattage 15.000m3/day
Công suất cao nhất  
Hệ thống xử lý nước thải Công suất 10.000m3/day
Internet và viễn thông ADSL, Fireber & Telephone line 4000 lines
LEASING PRICE: 
Land Land rents 60-80 USD
Rental term 50 years
Type/Class Level A
Payment methods 12 months
Deposit 0.1
Minimum area 1ha
Workshop 3
Management fee Management fee 0.4 USD/m2
Payment methods yearly
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook