CHAU DUC INDUSTRIAL PARK - BA RIA - VUNG TAU PROVINCE

General information about Chau Duc Industrial - Urban Park On July 11, 2007, the Prime Minister agreed to approve the investment policy in Chau Duc Industrial Park at the request of the People's Committee of Ba Ria - Vung Tau province in Directive Dispatch No. 919/TTg-CN.

General information about Chau Duc Industrial - Urban Park

On July 11, 2007, the Prime Minister agreed to approve the investment policy in Chau Duc Industrial Park at the request of the People's Committee of Ba Ria - Vung Tau province in Directive Dispatch No. 919/TTg-CN. Accordingly, Chau Duc Industrial Park - Urban Area was approved with an expected scale of 2,200 hectares, of which the industrial park land area is 1,550 hectares, the urban and service area area is 650 hectares, and at the same time assigned to the Ba Ba Provincial People's Committee. Ria - Vung Tau coordinates with investors to prepare and submit for approval the project to develop Chau Duc Industrial Park and Urban Area

On October 16, 2008, Chau Duc Industrial - Urban Park was established under Decision No. 3600/QD-UBND of the People's Committee of Ba Ria Vung Tau province. By September 30, 2019, the People's Committee of Ba Ria - Vung Tau province approved the planning of Chau Duc Industrial Park - Urban Area in Decision No. 2532/QD-UBND with a total area of 2,287 hectares, of which Industrial land is 1,556.14 hectares, urban and service area is 689 hectares, and the remaining 42 hectares are for other uses.

Chau Duc Industrial Park is designed with the purpose of building a modern industrial and urban service park with high-class amenities such as golf courses, residential areas, commercial centers, hospitals, and schools. creating a healthy community and stable production. Therefore, the infrastructure of the Industrial Park is invested with high quality both in terms of technology as well as landscape elements, creating an image like a modern industrial city in Chau Duc district of Ba Ria - Vung Tau province.

Chau Duc Industrial Park - Urban Area is a clean, multi-industry industrial park, with priority given to attracting manufacturing industries that do not pollute the environment such as: Assembly and production of electronic components; Pharmaceutical health products; Manufacturing, precision mechanical processing, electronic equipment manufacturing; Production of new materials and nanotechnology industries; Production of consumer plastic products; Cosmetic production; Warehouse logistics services... At the same time, absolutely refuse industries that have the potential to cause pollution, affecting the environment and living conditions of residents such as Chemicals, rubber processing, steelmaking, etc. .

Location of Chau Duc Industrial Park

The industrial park's location is considered convenient in terms of transportation and regional connection, specifically:

+ 44 km from Vung Tau city, 75 km from Ho Chi Minh city

+ About 16 km - 19 km from Cai Mep - Thi Vai deep-water port cluster

+ 54 km from Long Thanh Airport

+ About 13 km from Highway 51

Infrastructure of Chau Duc Industrial Park

Power supply system: The industrial park has 02 110KV/22KV transformer stations with the capacity of each station being 2*63 MVA, ensuring production power supply for all factories operating in the industrial park and Chau urban area. Virtue.

Clean water supply system: The industrial park's water treatment plant is capable of supplying clean water with a capacity of 150,000 m3/day and night and is pre-connected with water supply pipes to the fences of factories in the industrial park.

Wastewater treatment system: Chau Duc Industrial Park is planned to build 03 centralized wastewater treatment stations with treatment capacity of 7,000 m3/day and night, 19,000 m3/day and night, 19,000 m3/day and night respectively, total Capacity reaches 45,000 m3/day and night. Currently, the industrial park has completed construction and operation of the first two treatment stations.

Internal road system: Internal roads of Chau Duc industrial park are designed from 2 to 6 lanes wide with road width from 29 m to 54 m, constructed with high tonnage, meeting the requirements well. transportation and circulation needs in the industrial park.

About the ground: Chau Duc Industrial Park is built on an area with good geology, the load bearing capacity of the ground reaches from 9.1 tons to 31.68 tons. Because of the hard ground, construction in Chau Duc Industrial Park saves a lot of costs on foundation treatment, while also being able to ensure projects using heavy-duty machinery.

Land rental costs in Chau Duc Industrial Park

Infrastructure usage fee: 80 USD/m2/Until October 16, 2058. May vary depending on time, location and size of leased land

Management fee: 11,750 VND/m2/year

Annual land rent: Depending on the location of the rented land, applied according to the Land Price List from time to time of the People's Committee of Ba Ria - Vung Tau province

Wastewater treatment fee: 7,200 VND/m3

Water supply price: According to regulations of the People's Committee of Ba Ria - Vung Tau province

Electricity supply price: According to state regulations

Note: The above prices do not include VAT and are subject to change without prior notice

Investment incentives in Chau Duc Industrial Park: 100% exemption of tax payable for the first 02 years and 50% reduction of tax payable for the next 04 years

Support from the Industrial Park: The investor of the Industrial Park will support land lease investors in carrying out investment licensing procedures and necessary licenses to be able to construct and operate the project.

Current status of investment attraction in Chau Duc Industrial Park

Currently, Chau Duc Industrial Park has leased out over 40% of the land area of the entire zone with many projects from many different countries, typical projects such as: Sports shoe production project Sportswear of Dong Phuong Vung Tau Company (Taiwan), Garment project of Dasan Hygiene Vina Company (Korea); Plastic product manufacturing project of Magikan Vina company; Lining production project of SBSAMBO Co., Ltd. (Korea); SH SOLAR's solar power plant project and a series of other projects

Category Detail
OVERVIEW: 
Infrastructure Investor SONADEZI CHAU DUC JOINT STOCK COMPANY
Location Nghia Thanh commune, Suoi Nghe, Chau Duc district, Ba Ria - Vung Tau province, Vietnam
Acreage total area 2287 ha
Factory land area 1556 ha
Vacant area 500 ha
Ratio of green trees  
Operating time 2008
Current investors 36 Investors: SONADEZI CHÂU ĐỨC, Aurelial, PVCM, Makigan, Solar Farm, Dejuvina, Sungjin
Main job Electronic components, cables, telecommunications, electrical equipment, auto accessories, nanotechnology, gemstones, mechanics..., High technology
Occupancy 50%
LOCATION & DISTANCE: 
Road Distance from Ho Chi Minh City: 75km; Vungtau city: 44km Highway 56
Air Longthanh Airport: 54km; Tan San Nhat Intenational Airport: 70km
Train yes
Sea port Thi Vai seaport: 16km; Caimep 19km
INFRASTRUCTURE: 
Geological Sandy soil, K = 0.9
Internal traffic Main road Width:54m, Number of lane: 4 lanes
Secondary branch road Width: 29 m, Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/220/500KV
Source capacity 2x63MVA
Clean water Wattage 75.000m3/day
Highest capacity  
Waste water treatment system Wattage 45.000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 50-70 USD
Rental term 2058
Type/Class Level A
Payment methods yearly/ single payment
Deposit 6 months
Minimum area 1
Workshop 3-5 USD
Management fee Management fee 0.5USD/m2
Payment methods 12 months
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Insurance
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook