My Xuan B1 Industrial Park, also known as My Xuan B1 Industrial Park - CONAC was established on April 14, 1998 according to Decision No. 300/QD-TTg of the Prime Minister in the communes of My Xuan, Hac Dich, Tan Thanh district, Ba Ria - Vung Tau province, now My Xuan Ward, Phu My Town, Ba Ria Vung Tau Province with an expected planning area of 200 hectares with an initial investment capital of 266 billion VND and construction period. The operating term is 50 years from the date of issuance of the Investment Decision.
On November 3, 2006, the Ministry of Construction approved the first planning of My Xuan B1 Industrial Park in Decision No. 1509/QD-BXD and was adjusted by the People's Committee of Ba Ria Vung Tau province through Document No. 2284/QD-UBND dated October 27, 2014, Decision No. 3823/QD-UBND dated December 30, 2016; Decision No. 118/QD-UBND dated January 18, 2018. Accordingly, the total area of the approved industrial park is 227.14 hectares, of which the area of industrial land for lease is 160.41 hectares.

In April 2020, the Prime Minister approved reducing the area of My Xuan B1 Industrial Park from 227.14 hectares to 211.92 hectares and adding 110 hectares to the expanded My Xuan B1 Industrial Park planning.
In terms of nature: My Xuan B1 - Conac Industrial Park is an industrial park that attracts diverse investment including main industries such as: Construction Materials; wood production; Mechanical manufacturing, repair and assembly industry; Electronic assembly industry; Food and food processing industry; Some other industries do not pollute the environment.

My Xuan B1 industrial park is located in the southern key economic zone of Ho Chi Minh City - Dong Nai - Ba Ria Vung Tau - Binh Duong. Convenient transportation by road, waterway and air.
Power supply system: Taken from the National grid managed by Tan Thanh Electricity, pre-connected 22KV line to the fence of each factory in the Industrial Park
Clean water supply system: Clean water source is taken from Toc Tien water plant with capacity of 50,000 m3/day and night.
Wastewater treatment system: My Xuan B1 Industrial Park - CONAC has a centralized wastewater treatment system with a treatment capacity of 4,000 m3/day and night, capable of treating wastewater to standard A according to environmental technical regulations. Vietnamese school
Internal road system: The main road of the Industrial Park is 15 meters wide, including 4 lanes, branch roads are 7.5 meters wide, designed with two lanes.

Industrial gas supply system: Manufacturing plants in the Industrial Park that need to use gas will be connected from Vung Tau Low Pressure Gas Distribution Enterprise
Communication system: Guaranteed by the network infrastructure of telecommunications providers such as VNPT, VIETTEL, FPT..
Land rental costs and investment incentives at My Xuan B1 Industrial Park
Infrastructure usage fee: 80 USD/M2/until the end of the lease term
Management fee: 0.45 USD/m2/year
Wastewater treatment fee: 0.4 USD/m3. May vary depending on input wastewater standards
Clean water supply price: 12,500 VND/m3 (According to the price applied by the People's Committee of Ba Ria - Vung Tau province
Electricity supply price: Applied according to the electricity price prescribed by the State
Note: The above prices do not include VAT and are subject to change without prior notice
Investment incentives at My Xuan Industrial Park B1-CONAC: Apply a preferential tax rate of 17% within the first 10 years, of which, 100% exemption of tax payable for the first 02 years and 50% reduction of tax payable. paid for the next 04 years
Currently, My Xuan B1 Conac Industrial Park has leased 100% of the industrial park land area and is in the process of planning to develop My Xuan B1 Industrial Park - CONAC expansion. Typical projects in the Industrial Park: Ceramics production project of Granite VTC Ceramics Joint Stock Company, Motor and generator production project of Youngnam Vina, metal structure production project of DLHI Company Vietnam, Project of Global Aluminum Company, Project of Ewic Color Vietnam
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | IDICO- CONAC | |
| Location | Tan Thanh, Ba Ria Vung Tau | |
| Acreage | total area | 211.92 |
| Factory land area | 160.41 | |
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 1998 | |
| Current investors | ||
| Main job | ||
| Occupancy | 100% | |
| LOCATION & DISTANCE: | ||
| Road | To Ho Chi Minh City 55km | |
| Air | To Airport Tan Son Nhat 70km | |
| Train | To Station Bien Hoa 45km | |
| Sea port | To Seaport Thi Vai 5km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | 110/22 KV |
| Source capacity | ||
| Clean water | Wattage | |
| Highest capacity | 50.000m3/ngày đêm | |
| Waste water treatment system | Wattage | 4.000 m3/ ngày đêm |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factories | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | Annual | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |