Khu công nghiệp Mỹ Xuân B1 - Tiến Hùng được phê duyệt Quy hoạch theo Quyết định số 1479/QĐ-UBND ngày 18/05/2006 của Ủy ban nhân dân tỉnh Bà Rịa - Vũng Tàu và được phê duyệt Quy hoạch tại Quyết định số 1118/QĐ-BXD ngày 09/08/2006 của Bộ Xây Dựng, được điều chỉnh Quy hoạch tại Quyết định số 2533 QĐ-UBND ngày 30/09/2009 của UBND tỉnh Bà Rịa - Vũng Tàu.

My Xuan B1 Industrial Park - Tien Hung has a total planning area of 200 hectares, of which the area of industrial land and warehouse is 143.39 hectares in the administrative boundary now My Xuan Ward, Phu My Town, Ba Province. Ria - Vung Tau. The goal is to attract investment in a number of key areas such as: Leather shoe industry; Building materials; Mechanical manufacturing industry; Processing agricultural and forestry products and light materials; Animal feed.

Regarding traffic connections and regional links, My Xuan B1 Industrial Park - Tien Hung:
+ 08 km from Phu My Port, 05 km from Thi Vai port
+ 20 km from Long Thanh Airport, 70 km from Tan Son Nhat Airport
+ 70 km from Ho Chi Minh City, 40 km from Vung Tau city
Power supply system: Power produced at My Xuan B1 Industrial Park - Tien Hung is taken from the National grid and Phu My Power Plant through 02 110kV/22KV transformer stations with a capacity of 2*64 MVA
Water supply system: Guaranteed by Phu My Water Plant

Wastewater treatment system: The Industrial Park has a centralized wastewater treatment system with a total treatment capacity of 2,000 m3/day and night, ensuring the ability to treat wastewater generated from manufacturing plants in the Industrial Park.
Internal road system: Designed with width from 7.5 m to 15 m, road width from 19.5 m to 37 m
Communication system: Full communication infrastructure system, ready to connect depending on investor needs
Rainwater drainage system: The rainwater drainage system at My Xuan B1 Industrial Park - Tien Hung is arranged independently of the wastewater drainage system, ensuring the ability to prevent flooding in the industrial park.
Land rental costs at My Xuan B1 Industrial Park - Tien Hung
Infrastructure usage fee: 110 USD/m2/Until May 18, 2056. May vary depending on the location of the rented land and the rental period
Management fee: 0.5 USD/m2/year
Wastewater treatment fee: 0.35 USD/m3 for wastewater treated to column A and 0.4 USD/m3 for wastewater treated to column B
Water supply price: 12,500 VND/m3 (According to the price applied by the People's Committee of Ba Ria - Vung Tau province)
Electricity supply price: Applied according to the price schedule prescribed by the State
Note: The above prices do not include VAT and are subject to change without prior notice
Currently, My Xuan B1 - Tien Hung Industrial Park has been leased to 70% occupancy with typical projects such as: CJ Vietnam's animal feed production project; E-TOP's garment project; HANACANS metal container production project; Yarn production project of Vu Chan Company; Pavonine Vina's electronic components production project...
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investors | Tien Hung Production - Trading Company Limited | |
| Location | Tan Thanh, Ba Ria - Vung Tau | |
| Acreage | total area | 200 |
| Factory land area | 143.39 | |
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 2006 | |
| Current investors | ||
| Main job | ||
| Occupancy | 70% | |
| LOCATION & DISTANCE: | ||
| Road | To Ho Chi Minh City : 30km | |
| Air | To Airport Tan Son Nhat 70km | |
| Train | To Station Bien Hoa 45km | |
| Sea port | To Seaport Go Dau: 2km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | 110/22KV |
| Source capacity | 80 MVA | |
| Clean water | Wattage | |
| Highest capacity | 18,000 m3/day and night | |
| Waste water treatment system | Wattage | 10,000 m3 day and night |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 60 USD |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factories | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | Hàng năm | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Giá thành | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |