Phu My II Industrial Park was established under Decision No. 1729/CP-CN of the Prime Minister dated November 18, 2004 and Decision 2089/QD-UBND dated June 29, 2005 of the People's Committee of Ba Ria - Vung Tau province. .
On August 10, 2006, Phu My II Industrial Park was approved for planning according to Decision No. 1130/QD-UBND dated August 10, 2006 of the Ministry of Construction with a planning area of 620.6 hectares, within the administrative boundary. Currently, Phuoc Tan Ward and Phu My Ward, Phu My Town, Ba Ria Vung Tau Province.

On September 15, 2021, the People's Committee of Ba Ria - Vung Tau province approved the Decision to locally adjust the 1/2000 scale subdivision of Phu My II Industrial Park according to Decision No. 2785/QD-UBND. According to the adjustment content, the area of industrial land for lease in Phu My II Industrial Park was adjusted to increase from 388.93 hectares to 425.49 hectares (Including land area for factory construction and warehouse land area). .
Phu My II Industrial Park is an industrial park with the goal of attracting multi-sector investment, including:
Consumer goods manufacturing industry (Food, seafood; textiles; footwear production, high-end leather goods; paper production; agricultural and forestry products; ceramic and glass production...); Cosmetic and petrochemical industry (excluding oil refining industry); Mechanical assembly and repair industry; Metallurgy, drawing, rolling; Electronic and information industry; Biotechnology; Building materials; Production of plastic beads and plastic products; Production of products from rubber; Stationery and utensils; Logistic services; Some other fields
The industrial park is located in the planning area of Seaport system No. 5 with many large ports in operation, receiving many large tonnage ships such as Phu My Port, SP-SPA International Port, Saigon Vietnam International Port. (SITV), Cai Mep International Port (CMIT)
Soil conditions:
Altitude above sea level:
Climate conditions: Average humidity: 70 - 85%; Average temperature: 29 - 32oC; Average annual rainfall: 1,606 mm; The rainy season starts from May to the end of October every year; The dry season starts from October to the end of April every year

Distance to the nearest big city:: National Highway 51: 1.5Km; Ho Chi Minh City - Long Thanh - Dau Giay Expressway: 30 Km;
Vung Tau City: 40 Km; Ho Chi Minh City: 60 Km; Bien Hoa City: 55 Km
Distance to Provincial Center:
Distance to nearest Airport: - Tan Son Nhat Airport: 75 Km - Long Thanh Airport (future): 35 Km
Distance to nearest railway station: Saigon Station: 65 Km; Bien Hoa Station: 60 Km
Distance to nearest river port:
Distance to nearest seaport: National Highway 51: 1.5Km; Ho Chi Minh City - Long Thanh - Dau Giay Expressway: 30 Km; Vung Tau City: 40 Km; Ho Chi Minh City: 60 Km; Bien Hoa City: 55 Km
Power supply system: Connected from the National grid managed and provided by Tan Thanh Electricity/Ba Ria - Vung Tau Electricity
Water supply system: Clean water produced at Phu My II industrial park is taken from Toc Tien water plant with a capacity of 50,000 m3/day and night and is connected to the factory fence.

Wastewater treatment system: The centralized wastewater treatment station at Phu My II Industrial Park with a treatment capacity of 4,000 m3/day and night has been put into operation, with a pre-connected drainage connection point to the fence of each house. machine, capable of treating wastewater from column B according to environmental technical standards.
Communication system: Complete, ready to connect according to the needs of land lessees
Internal road system: Includes main roads and branch roads with widths from 8m - 75 m, ensuring good mobility in the Industrial Park
Natural gas supply system: Phu My II Industrial Park is located near gas processing projects and has easy connection to supply industrial gas to customers who need to use gas.
Infrastructure usage fee: 125 USD/m2/lease term
Industrial park management and maintenance fee: 0.65 USD/m2/year, can be adjusted annually with an increase of 3.5% each time

Annual land rent: 2,371 VND/m2/year, adjusted according to the decision on land price list of the People's Committee of Ba Ria - Vung Tau province
Electricity supply price: Applied according to the state's electricity supply tariff
Water supply price: 12,500 VND/m3
Wastewater treatment fee: 0.4 USD/m3
Other costs: Depending on the needs of the land lessees
Investment incentives in Phu My II Industrial Park:
Enjoy a preferential rental rate of 17% within 10 years, including 100% exemption of tax payable for the first 02 years and 50% reduction of tax payable for the next 04 years.
In addition, investors also receive free support from the investor of Phu My II Industrial Park with investment licensing and business registration procedures for projects in Phu My II Industrial Park.
Currently, Phu My II Industrial Park has leased over 327 hectares with a total of 425.9 hectares (according to the latest adjusted rate), reaching an occupancy rate of about 77% (September 2021), the total land fund capable of leasing The remaining lease is about 67 hectares. Some typical projects in Phu My II Industrial Park can be mentioned as: Project of Dong Tien Viet Nhat Steel Company, project of POSCO Vietnam, Nippon Spiral Welding Steel Company, Manuchar Phu My, CR Bearing Vietnam , Linde Gas...
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | IDICO Corporation (Vietnam Urban and Industrial Park Development Investment Corporation) | |
| Location | Tan Phuoc Commune, Phu My Town - Phu My Town - Ba Ria City - Vung Tau | |
| Acreage | total area | 620.6ha |
| Factory land area | 372.5ha | |
| Vacant area | 212.4ha | |
| Ratio of green trees | ||
| Operating time | 1/1/2005 | |
| Current investors | ||
| Main job | Production of building materials; Producing and processing steel industry products; Mechanical processing, manufacturing machinery and equipment; Electrical and electronic industry; Industries have a need to use the port; Other industries not prohibited by law. | |
| Occupancy | 77,24 % | |
| LOCATION & DISTANCE: | ||
| Road | To Ho Chi Minh City Center: 60km | |
| Air | Tan Son Nhat Airport: 70 Km, To Long Thanh International Airport (Dong Nai Province): 30km | |
| Train | To Bien Hoa Station (Dong Nai Province): 60km | |
| Sea port | To Phu My Port (Ba Ria Vung Tau Province): 2km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | 4 làn xe |
| Secondary branch road | 2 làn xe | |
| Electricity supply | Voltage | 110/22KV |
| Source capacity | 103MVA | |
| Clean water | Capacity | |
| Highest capacity | 50.000 m3/ngày đêm | |
| Waste water treatment system | Wattage | 4.000m3/ngày |
| Internet and telecommunications | Modern, meeting standards to meet the needs of investors | |
| LEASING PRICE: | ||
| Land | Land rents | 105-110 USD |
| Rental term | 50 năm | |
| Type/Class | ||
| Payment methods | linh hoạt | |
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factory | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.65 USD/m2 |
| Payment methods | Annual | |
| Electricity price | Peak | 0.12 USD |
| Normal | 0.067 USD | |
| Idle | 0.044USD | |
| Payment methods | hàng tháng | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.54 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.4 USD/m3 |
| Payment methods | hàng tháng | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | yes | |