DONG SOUTH INDUSTRIAL PARK - HCMC

Details about Dong Nam industrial park As you know, the Southeast Industrial Park in Cu Chi is a key economic exchange address with other provinces and cities of the city. HCM.

Details about Dong Nam industrial park

As you know, the Southeast Industrial Park in Cu Chi is a key economic exchange address with other provinces and cities of the city. HCM. So do you know anything about the location or characteristics of this Southeast Industrial Park?

As you know, the Southeast Industrial Park in Cu Chi is a key economic exchange address with other provinces and cities of the city. HCM. So do you know anything about the location or characteristics of this Southeast Industrial Park? Please join us to find out through the following article:

Southeast Cu Chi Industrial Park is located in Binh My commune and Hoa Phu commune, Cu Chi, Ho Chi Minh City. This place has an area of up to 227 hectares. It is located in the area of ​​Binh My commune and 115 hectares is located in the territory of Hoa Phu commune. To the east of this Southeast Industrial Park, it is bordered by Provincial Road 9. As for the north, it will be bordered by an existing residential area. Along with Provincial Road 8. While the west borders Ben Than Road and the south is bordered by agricultural land.

Southeast Industrial Park with a total area of 342.53 hectares. Of which, part of the land is for housing, resettlement land, urban land, educational land... accounting for 55 hectares, the rest is industrial land.

Dong Nam Industrial Park to other locations:

From Dong Nam Industrial Park to Ho Chi Minh City Center: 26 km

From Dong Nam Industrial Park to Binh Duong Province: 1 km

From Dong Nam Industrial Park to Tan Son Nhat Airport: 21 km

From Southeast Industrial Park to Trans-Asia Road: 10 km

From Southeast Industrial Park to Northwest Cu Chi Urban Area: 18 km

From Dong Nam Industrial Park to Hiep Phuoc Container Port: 42 km

From Dong Nam Industrial Park to ICD Phuoc Long: 25 km

From Dong Nam Industrial Park to Moc Bai Border Gate: 56 km

From Dong Nam Industrial Park to Saigon Station: 24 km

From Dong Nam Industrial Park to Bien Hoa City, Dong Nai: 29 km

Dong Nam Industrial Park

Mechanical engineering profession

Investing in the electronics profession

Investing in the Information Technology profession

Investing in the production of pharmaceutical products, herbs, and medical drugs

Investing in the consumer food and beverage industry

Investing in the production of construction materials and interior decoration.

Investing in the profession of manufacturing sports equipment and exercise equipment.

Investing in the chemical industry of plastics

Investing in high-tech rubber industry

Category Detail
OVERVIEW: 
Infrastructure investor Saigon VRG Investment Joint Stock Company
Location Cu Chi District, Ho Chi Minh City
Acreage total area 342.53
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 2008
Current investors  
Main job Mechanical engineering; electronics and information technology; pharmaceutical chemistry, herbs, medical drugs; industrial chemicals for plastics and high-tech rubber; construction materials, interior decoration, sports equipment
Occupancy 80 %
LOCATION & DISTANCE: 
Road About 25 km from Ho Chi Minh City
Air About 20 km from Tan Son Nhat airport
Train Yes
Sea port Cat Lai port is about 32 km; Hiep Phuoc port 42 km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Width: 40m, Number of lane: 6 lanes
Secondary branch road Width: 29&18m, Number of lane: 4 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 2x63 MVA
Clean water Wattage  
Highest capacity 15000m3/ngày đêm.
Waste water treatment system Wattage 15000 m3/ngày đêm
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 100
Rental term 2058
Type/Class Level A
Payment methods 12 months
Deposit 0.05
Minimum area 1 ha
Workshop 4 USD
Management fee Management fee 0.35 USD/m2
Payment methods 3 months/12 months
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook