BINH CHIEU INDUSTRIAL PARK - HCMC

OVERVIEW OF BINH CHIEU INDUSTRIAL PARK - HCMC Binh Chieu Industrial Park, Thu Duc City has a scale of 27.34 hectares, established in 1997, officially put into operation in March 2000. With the advantage of being located at the intersection of the two largest industrial centers of Vietnam. Industrial zone 5, Binh Chieu Industrial Park has extremely ideal connectivity.

OVERVIEW OF BINH CHIEU INDUSTRIAL PARK - HCMC

Binh Chieu Industrial Park, Thu Duc City has a scale of 27.34 hectares, established in 1997, officially put into operation in March 2000. With the advantage of being located at the intersection of the two largest industrial centers of Vietnam. Industrial zone 5, Binh Chieu Industrial Park has extremely ideal connectivity. Binh Chieu Industrial Park is surrounded by many vital traffic routes: National Highway 1A, National Highway 1K, National Highway 13, My Phuoc - Tan Van Expressway (Ring Road 2), Hanoi Highway, Metro line,...

By 2020, the occupancy rate has reached 100%, a total of 21 domestic and foreign investors with a total investment capital of 80,728,312 (USD). With the advantage of achieving occupancy rates for many years, Binh Chieu and Thu Duc industrial parks have been supporting businesses to develop stably and grow effectively. Continuously upgrade infrastructure, creating the best conditions for businesses to operate. Binh Chieu Industrial Park contributes significantly to the general economy of Thu Duc City, while creating more than 4,500 jobs for local and foreign workers.

Location

Binh Chieu Industrial Park is located at Lien Provincial Road 43, Binh Chieu Ward, Thu Duc City, City. Ho Chi Minh. This place is right at the northern gateway, connecting Ho Chi Minh City with Binh Duong province. Therefore, Binh Chieu Industrial Park inherits many advantages in transporting goods and creating connections. From the industrial park, it is convenient to get to industrial parks in Binh Duong, linked to seaports, inland ports, bus stations, airports, service areas...

The infrastructure

Internal traffic

The road surface is paved with asphalt concrete. Main axis: 30m. Branch roads with widths of 12m and 20m.

Power system

Use the national power grid. General electricity network of the City. Ho Chi Minh from 110/15KV Thu Duc Bac station.

Public lighting system

The road lighting network is designed separately from the domestic power supply system, arranged along traffic routes.

Water system

Underground water supply capacity: 5000 m3/day-night.

Wastewater and rainwater drainage system

The industrial park invests in building a complete rainwater drainage system for the area that has been cleared.

Process rubbish

Investors will sign service contracts with licensed professional waste treatment units according to regulations.

Wastewater treatment

The capacity of the industrial park's wastewater treatment plant is 3,000 m3/day-night..

Communication systems

The telecommunications system meets international standards, ready to meet the needs of high-speed communication and data.

Main industries in the industrial park

Binh Chieu Industrial Park mainly prioritizes the development of the following industries:

Manufacturing mechanical products

Power electronics

Paper packaging products

Building materials

Processing food and forest products

High quality paint

Maintenance of steel products.

Labor costs

Binh Chieu Industrial Park is located in Thu Duc City - Ho Chi Minh City, in region I. Therefore, the current minimum wage in region I is 4,680,000 VND/month.

Social infrastructure

Customs services: convenient import and export procedures.

Banks: Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…

Post office: TDT express, VNPT, DHL, FedEx, TNT... door-to-door shipping service. Bus: Convenient network of bus routes from the Industrial Park to the provinces

Fire protection: Fire hydrants are arranged on the sidewalks of roads with a distance of 150m/post, and are connected to clean water supply pipes in the industrial cluster.

Accommodation: The industrial park is near a busy residential area, ensuring the accommodation and living needs of the industrial park's employees.

Hospital: Thu Duc city and Binh Tan district have a comprehensive medical system, meeting the health care and medical examination and treatment needs of the people.

School: Training system at all levels from preschool, taking good care of the quality of education for the educational needs of the district and city.

Category Detail
OVERVIEW: 
Infrastructure investor Binh Chieu Industrial Park Infrastructure Development Service Company
Location Interprovincial Road 43, Binh Chieu Ward, Thu Duc District, Ho Chi Minh City
Acreage total area 27.34
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 1997
Current investors  
Main job Types of industry such as mechanical product manufacturing; power electronics; paper packaging products, construction materials; food and forest product processing; High quality paint, maintenance of steel products.
Occupancy 100 %
LOCATION & DISTANCE: 
Road About 15 km from Ho Chi Minh City
Air About 14 km from Tan Son Nhat airport
Train 15 km from Saigon station
Sea port Saigon Port is about 16 km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Width: 30m, Number of lane: 4 lanes
Secondary branch road Width: 20&12m, Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 2x63 MVA
Clean water Wattage  
Highest capacity 5000m3/ngày đêm
Waste water treatment system Wattage 3000m3/ngày đêm
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 100 USD
Rental term 2047
Type/Class Level A
Payment methods 12 months
Deposit 0.05
Minimum area 1 ha
Workshop 4 USD
Management fee Management fee 0.35 USD/m2
Payment methods 3 months/12 months
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook