EXISTING TAN TAO INDUSTRIAL PARK - HCMC

OVERVIEW OF THE EXISTING TAN TAI INDUSTRIAL PARK - HCMC Tan Tao Industrial Park was established in 1996 with a total area of 343.9 hectares and is the largest industrial park among 10 industrial parks in Ho Chi Minh City in particular and the southern region in general.

OVERVIEW OF THE EXISTING TAN TAI INDUSTRIAL PARK - HCMC

Tan Tao Industrial Park was established in 1996 with a total area of 343.9 hectares and is the largest industrial park among 10 industrial parks in Ho Chi Minh City in particular and the southern region in general.

As of early September 2006, after nearly 10 years of operation, Tan Tao Industrial Park has attracted over 5,324 billion VND and 122 million USD, with a total number of investors in the existing zone being 146, the expansion zone being 84, of which There are 183 factories in operation, 06 factories are under construction. Current investors in industrial parks are over 80% domestic enterprises, the rest are foreign enterprises such as Taiwan, Hong Kong, America, England, Korea, China...

Up to now, Tan Tao Industrial Park has received 01 Labor Medal 3rd class, 01 Labor Medal 2nd class, four consecutive years 2000-2001-2002-2003 received the Emulation Flag from the Prime Minister and many certificates of merit from the City. as well as the Government and Unions at all levels for successfully completing the task of building Tan Tao Industrial Park into a developed and successful industrial park with complete infrastructure, internal road system, water supply, drainage, and electricity. , wastewater treatment system, medical station, modern information technology system...

- Hien Huu Industrial Park is 161.35 hectares established under Decision 906/TTg of the Prime Minister dated November 30, 1996 on approving the investment project for construction and infrastructure business of Tan Tao Industrial Park. , Binh Chanh district, Ho Chi Minh City, Adjustment Decision 1566/QD-UBND dated April 1, 2013;

- 182.55 ha Expanded Industrial Park was established under Decision 473/QD-TTg of the Prime Minister dated May 12, 2000 on approving investment projects for construction and business of industrial park technical infrastructure. Tan Tao Expansion, Ho Chi Minh City, Adjustment Decision No. 1512/QD-UBND dated April 4, 2008 of the City People's Committee.

Rated as the most successful industrial park in the city. HCM with a very high occupancy rate, Hien Huu Industrial Park over 97.14%, Expanded Industrial Park 78.02%. Tan Tao Industrial Park is always a destination for domestic and foreign investors. Being present in Tan Tao Industrial Park is also an opportunity to affirm the name of the business.

Geographical location

Located in Binh Tan District, Ho Chi Minh City.

3.5km from National Highway 1A and next to Saigon - Trung Luong highway.

12km from Tan Son Nhat airport

15km from Saigon Port

The infrastructure

- Traffic road:

Industrial park main road - Number of lanes and road surface width: 30m

Industrial Park internal roads - Number of lanes and road surface width: 20m

- Power supply:

Supplied from a 110/15 KV transformer station, ensuring adequate and stable power supply.

- Water supply system: City tap water system and separate network air conditioning system for the Industrial Park, ensuring full supply of water needs for businesses to operate.

- Wastewater treatment system: Capacity 10,500 m3/day and night, complete treatment system and connected to each business.

Investment costs

Rental price is 220-260 USD/m2

Lease term: Hien Huu Industrial Park: until 2047, Expanded Industrial Park: until 20150

Payment method: One time/yearly

· 50% Prepayment after signing the Agreement.

· 50% Payment upon completion of investment procedures to sign the contract or deferred payment within 5 years from signing the contract (interest rate for deferred payment).

Management fee: 0.0175USD/m2/month

Electricity price:

· Peak hour: 3,074 VND/Kwh (excluding VAT)

· Normal hours: 2,766 VND/Kwh (excluding VAT)

· Off-peak hours: 1,152 VND/Kwh (excluding VAT)

Water price: 15,000 VND/m3 (excluding VAT)

Wastewater treatment fee: type B: 3,500 VND/m3, type C: 6,200 VND/m3

Infrastructure maintenance fee:

· Customer: 10,018 VND/m2/year

· KMR: 12,730 VND/m2/year

Industry attracts investment

- Mechanical, electrical and electronic industries.

- Agricultural product, seafood and food processing industry.

- Cosmetic and pharmaceutical processing industry.

Category Detail
OVERVIEW:
Infrastructure investor Tan Tao Investment and Industry Joint Stock Company (ITACO)
Location Lot 16, Street 2, Tan Tao Industrial Park, Tan Tao A Ward, Binh Tan District, Ho Chi Minh City.
Acreage total area 380.15 ha
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 2000
Current investors 259
Main job Mechanical, electrical, electronic industries, agricultural and aquatic product processing, food and beverage processing, cosmetics and pharmaceuticals processing
Occupancy 90 %
LOCATION & DISTANCE:
Road 12 km from Ho Chi Minh city center
Air 12 km from Tan Son Nhat International Airport
Train 14 km from Saigon station
Sea port It is 15 km from Saigon port
INFRASTRUCTURE:
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Width: 30m, Number of lane: 4 lanes
Secondary branch road Width: 20m, Number of lane: 2 lanes
Electricity supply Voltage 110/15 KV
Source capacity  
Clean water Wattage 5000 m3/ngày đêm
Highest capacity 10000 m3/ngày đêm
Waste water treatment system Wattage 12000 m3/ngày đêm
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE:
Land Land rents 220-260 USD
Rental term 2050
Type/Class Level A
Payment methods 12 months
Deposit 0.05
Minimum area 1 ha
Workshop 4 USD
Management fee Management fee 0.35 USD/m2
Payment methods 3 months/12 months
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees yes