Tan Tao Group has more than 20 years of experience operating in the field of consulting, investment - construction, exploitation - trading of industrial park infrastructure. Leading in investment and exploitation of industrial park system in Vietnam.
Tan Tao Group's projects are spread evenly across Vietnam with large scale, high reputation with customers and the best quality such as: Tan Tao Industrial Park, Tan Duc Industrial Park - Tan Duc E.City Tri Thuc City, Nhon Hoi Industrial Park, Nhon Trach Industrial Park...
.jpg)
And in the future are regional projects such as: Tan Tao - Hanel Industrial Park, Kien Luong Industrial - Energy Complex, Nam Du Deep Water Port, Saigon Mekong Science City...
Tan Duc - Long An Industrial Park is invested in a synchronous and modern infrastructure system that well meets the production and investment criteria of businesses. In addition, it has the advantage of geographical location, adjacent to provincial roads 830 and 825 to National Highway 1A, far from the City Center. 20km from Ho Chi Minh City and 20km from Tan Son Nhat International Airport, 15km from Ben Luc Town, with 33ha Vam Co Dong River Port, convenient for importing and exporting goods of businesses in Tan Duc Industrial Park.
In 2007, the industrial park was officially invested in phase I with a scale of 256 hectares. Based on inherent advantages, the industrial park has a fast and effective occupancy rate, accounting for about 90% of the area in phase I with a total registered investment capital of over 122 million USD. Out of 103 projects licensed for investment, 60 projects have gone into stable production operations, greatly impacting the local budget and creating jobs for workers in neighboring districts. near.
Tan Duc Industrial Park is focused on developing by the investor in a sustainable and environmentally friendly direction with a large green area covered in the industrial park, meeting the standards of Green - Clean - Beautiful Industrial Park with a treatment plant system. Modern wastewater treatment capacity of 20,000m3/day. Because this is an Industrial - Service - Urban Park complex, investors can enjoy many high-end utility services including sports and entertainment facilities, creating a complete living environment, Modern and comfortable.
.jpg)
Long An always ranks in the Top 10 in terms of competitiveness index and FDI attraction. By 2020, Long An will become a developed industrial province.
Tan Duc Industrial Park has the closest connection distance to Ho Chi Minh City center (28km) compared to other industrial parks in other provinces.
20km from Tan Son Nhat airport
20km from Bourbon port
From road N2 (Lifeline to the Western provinces): 5km
Located adjacent to the main traffic gateway of the three axes of the Southeast - Ho Chi Minh City - Mekong Delta, Tan Duc Industrial Park - Urban - Service Complex with physical facilities meeting high quality standards will satisfy the needs of customers. Satisfy all strict requirements of domestic and foreign businesses. Power grid systems and independent power stations, the most modern clean water supply system, industrial waste treatment system meeting international standards, extensive telecommunications and communication services ensure to meet all needs. production and consumption needs of the Tan Duc population.
%20(1).jpg)
Tan Duc Industrial Park with modern infrastructure such as: street system with trees and modern designed lights, lakes with an area of 10 hectares, underground power line system ensures beauty and safety, cable TV system and high-speed internet network, along with modern water supply and drainage system. In addition, Tan Duc Industrial Park also invests in building modern utility services such as Tan Tao hospital, schools, sports complexes, financial centers, supermarkets, and amusement parks. mind.
The Security - Fire Protection team is professionally trained to ensure 24/7 security and fire protection in the industrial park, helping businesses work with peace of mind.
Electricity price (22KV):
Normal hours (From 4:00 a.m. to 6:00 p.m.): 1,748 VND/Kwh.
Peak hour (From 6:00 p.m. to 10:00 p.m.): 2,965 VND/Kwh.
Off-peak hours (From 10 p.m. to 4 a.m.): 1,213 VND/Kwh.
(Tan Duc Company lowers stations for customers +230 VND/Kwh)
Water price: 14,000 VND/m3.
Wastewater treatment fee: 7,200 VND/m3
The amount of wastewater generated is calculated as 80% of the input water supply and enterprises must treat it to class B standards before discharging into the general wastewater system of the industrial park. Enterprises must pay wastewater treatment fees according to the unit price prescribed by Tan Duc Company.
Infrastructure maintenance fee in the industrial park: 10,018 VND/m2/year.
Other fees such as telephone, fax, internet, etc. are calculated according to the regulations of the service provider.
Other costs will apply according to the price approved by the Management Board of Long An Economic Zone.
- Thuế thu nhập doanh nghiệp: 02 năm đầu Miễn thuế TNDN 0% (kể từ năm có thu nhập chịu thuế), 04 năm tiếp theo Giảm 50% ( tức đóng thuế suất thuế TNDN là 8.5%), 04 năm cuối của thời hạn ưu đãi là 17%. Sau thời gian ưu đãi thuế suất thuế TNDN theo quy định là 20%
- Thuế xuất / nhập khẩu: Miễn thuế nhập khẩu đối với hàng hóa nhập khẩu theo Chương II của Nghị Định số 134/2016/NĐ-CP, Ngày 01/09/2016 Chính phủ và các thời hạn khác.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Tan Duc Investment Joint Stock Company | |
| Location | Duc Hoa Ha commune, Duc Hoa district, Long An province | |
| Acreage | total area | 543.65 |
| Factory land area | 374.51 | |
| Vacant area | 198 | |
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | LIKSIN, TEXINA, SONGWOL VINA, … | |
| Main job | Textile dyeing; Food Processing; building materials; mechanical; paper and paper products; consumer goods | |
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | 20km from Ho Chi Minh City | |
| Air | 20km from Tan Son Nhat Airport | |
| Train | 25km from Saigon station | |
| Sea port | 25km from Saigon port | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Width: 30m, Number of lane: 4 lanes |
| Secondary branch road | Width: 20m, Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 2x63MVA | |
| Clean water | Wattage | |
| Highest capacity | 48.000 m3/day | |
| Waste water treatment system | Wattage | 9000 m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 60 USD |
| Rental term | 2053 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |