An Nhut Tan industrial park project began construction on June 10, 2020, located at 57/5 provincial road 832, An Nhut Tan ward, Tan Tru district, Long An province. The investor of An Nhut Tan industrial park, An Nhut Tan Co., Ltd., has oriented An Nhut Tan industrial park to become a high-quality industrial park, a green industrial park, reaching international standards. An Nhut Tan Industrial Park will be a promising destination for investors, large manufacturers and potential businesses in the world.

An Nhut Tan Industrial Park is located in an extremely convenient location, specifically:
- 38 km (50") from Ho Chi Minh City (District 1)
- 36 km (40") from Phu My Hung Center (District 7)
- 12 km (20") from Tan An City
- 08 km (10") from Ben Luc Town

- Distance to waterway system & port:
- Bourbon Port 08 km (12")
- Long An International Port 37 km (55")
- Tan Thuan Port 40 km (30")
- Cat Lai Port 46 km (30")
Distance to airport:
- Tan Son Nhat Airport 39 km (75")
- Long Thanh International Airport 80 km (120")
Traffic
- Main road: 40m
- Secondary road: 8m, 12m, 15m (vehicles)

Power system:
- EVN power plant provides: 110/22 KV - 70 MWA
- Voltage: 22KV - Frequency: 50 Hz
Water supply system:
- Provided by Long An Water Company (LAWACO), meeting QCVN 01: 2009 / BYT standards
- Capacity: 4,800m3/day
Wastewater treatment:
Capacity: 3,900m3/day and built in 2 modules:
- Phase 1: Capacity 2,000m3/day.
- Phase 2: Capacity 1,900m3/day and night
Output processing standards: Level A according to CVN40: 2011 / BTNMT
Telecommunications: Internet, Fiber Optic Cable / ADSL
- Management fee: 18,000 VND / m2 / year
Payment: Prepaid quarterly
- Initial fee: 120,000,000 VND
Payment: within 14 days after receiving land handover
- Land lease term: September 8, 2058
- Electricity: According to National Circular: updated March 2019
+ Off-peak hours: 1,007 VND / Kwh
+ Normal hours: 1,555 VND / Kwh
+ Peak hour: 2,871 VND / Kwh
Payment: Monthly, according to EVN's schedule
- Clean water supply level: 11,750 VND / m3
Payment: Monthly
- Water consumption fees will be subject to regulation by LAWACO
- Wastewater: treatment rate is 80% of monthly water consumption. Rates will be confirmed later.
+ Output processing standards: Level A
+ Input processing standards: Level B
Payment: Monthly
- Other costs: Phone, internet, fax fees... are calculated according to the service provider's regulations.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Long An Steel Company Limited | |
| Location | An Nhut Tan commune, Tan Tru district, Long An province | |
| Acreage | total area | 120 |
| Factory land area | 71 | |
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | ||
| Main job | Processing industry; light industry; chemical industry; construction materials, consumer goods; high-tech industry | |
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | From Ho Chi Minh City center: 30km | |
| Air | From Tan Son Nhat airport: 29km | |
| Train | From Saigon station: 34km | |
| Sea port | From Saigon port: 23km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes |
| Secondary branch road | Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | ||
| Clean water | Wattage | |
| Highest capacity | ||
| Waste water treatment system | Wattage | |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 180 USD |
| Rental term | ||
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |