Phu An Thanh Industrial Park (or PAT IP) was established in 2007 with the investor being Phu An Thanh - Long An One Member Company Limited with an initial planning area of 692 hectares. In which the planning area for phase 1 is 387 hectares (including 80 hectares of expansion), the planning area for phase 2 is 305 hectares.
On March 27, 2021, Phu An Thanh Industrial Park was adjusted to reduce its area to 352.7511 hectares according to Decision 469/QD-TTg of the Prime Minister.

In terms of nature: Phu An Thanh Industrial Park is an industrial park that attracts multi-sectors, in which the goal is to attract industries such as: garment, textile dyeing, plating; animal feed processing; Production of building materials; production of wooden products; pharmaceutical production; electronics industries; food and beverage production; manufacturing equipment and spare parts...
Regarding regional connection location: Phu An Thanh Industrial Park has a convenient traffic connection location to central areas and transportation infrastructure.

+ Only 37 km from Tan Son Nhat Airport
+ 30 km from Saigon Port
+ 35 km from Hiep Phuoc Port
+ 3 km from Ho Chi Minh - Trung Luong Expressway
Power supply system: taken from the national grid through the 110/22kV internal transformer station with a capacity of 90 MVA
Water supply system: Phu An Thanh Industrial Park is invested in building a clean water supply plant corresponding to 02 construction phases, of which, phase 1, the project has a water supply capacity of 9,000 m3/day and night. , phase 2 was built with a design capacity of 48,000 m3/day and night

Wastewater treatment system: the industrial park builds 02 wastewater treatment stations in 02 phases, with wastewater treatment capacity reaching 3,300 m3 and 9,600 m3/day and night respectively.
Communication system: Invested synchronously, ready to reach each factory in the industrial park
Infrastructure usage fee: 168 USD - 188 USD/m2/entire lease term depending on leased area and production sector
Management fee: 0.67 USD/m2/year
Annual land rent: According to the decision of Long An Provincial People's Committee
Clean water price: 11,100 VND/m3

Electricity supply price: Applied according to EVN's electricity supply tariff plus 9 USD/KVA surcharge for industrial parks
Wastewater treatment fee: 10,200 VND - 16,700 VND/m3 depending on the quality of input wastewater
Note: The above prices do not include VAT and are subject to change without prior notice
Investment incentives: 100% corporate income tax exemption for the first 02 years, 50% tax reduction for the next 04 years.
In addition, the investor of Phu An Thanh Industrial Park also supports free implementation of investment licensing procedures for land lease projects in the industrial park.
Currently, the industrial park has been put into operation with an occupancy rate of over 75% of the entire industrial park area with a series of typical projects such as the Plywood Production Project of Fukui Vietnam Furniture Co., Ltd. Vina Eco Board LLC; Metal products production project of Minh Huu Lien Joint Stock Company; Textile project of Fastwell Vietnam Co., Ltd...
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Phu An Thanh One Member LLC - Long An | |
| Location | An Thanh commune, Ben Luc district, Long An | |
| Acreage | total area | 387 |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | ||
| Main job | Garment, textile; mechanical and plating professions; Production of building materials; processing food and agricultural products after harvest | |
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | 35 km from Ho Chi Minh city center | |
| Air | 37 km from Tan Son Nhat Airport | |
| Train | ||
| Sea port | 7 km from Bourbon River port | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes |
| Secondary branch road | Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | ||
| Clean water | Wattage | 13.000m3/day |
| Highest capacity | 50.000m3/day | |
| Waste water treatment system | Wattage | 10.000m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 80-90 USD |
| Rental term | 2057 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |