Binh Hoa Industrial Park is located at the Highway 3 intersection, next to Highway 91 and Provincial Road 941, in Chau Thanh, An Giang Province. Prime location for transportation and located right in the agricultural and aquatic raw materials area of Long Xuyen quadrangle. Is one of the industrial clusters recognized by investors in An Giang. Therefore, Binh Hoa Industrial Park is considered a typical southern infrastructure.

Binh Hoa Industrial Park has a planned land area of 131.8 hectares, of which the industrial land area that can be rented is about 96 hectares. Up to now, equipment registration certificates have been issued for 15 investment scales, with an area of 88 hectares (92% occupancy rate), including 05 investment scales abroad; The total licensed investment capital spent by the business community is 4,095 billion VND, currently 11 investment scales have been put into operation, bought and resold; has handled jobs for about 10,300 workers, most of whom are workers in the province.
Investor: Management Board of Industrial Parks of An Giang province
Land area: 131.8 hectares
Completed: 2012
Land rent: 50$/m2/year
Infrastructure usage fee: Included in the rental price
Service fee: 0.4$/m2/month
Service fee includes: Periodic maintenance: security system, general cleaning, landscape maintenance, utilities, internal roads, sidewalks, Maintenance, maintenance of infrastructure, traffic, Warranty General infrastructure: rainwater pipes, sewers, water and electricity in the industrial park, 24/7 security, Cleaning of the industrial park
Electricity fee: 0.05$/kWh
Payment: Annually
Wastewater fee: 0.3$/m3
Water fee: 0.4$/m3
The project is located in a new economic area full of development potential in the Mekong Delta, which is An Giang. There are many advantages in economic development, hand-delivered infrastructure, and plans to abandon the project. Interestingly, real estate in the Southwest is making a good impression on many prominent businessmen. During that period, An Giang was considered a bright candidate, facing many outbreak opportunities in the coming time. In recent years, the Mekong Delta has received intense attention from the government as it accounts for 20% of the number of people living in the country, contributing 18% to the country's GDP. In the context of the covid-19 pandemic, the efforts of the Mekong Delta regions have contributed to making Vietnam one of the few countries in the world with positive GDP growth in 2020.

An Giang is a land with high economic development progress, known as the capital of rice and pangasius, a source of exported agricultural and aquatic products to foreign countries, and is the capital of economic transactions connecting the two countries. 3 big cities: Ho Chi Minh City. Saigon, saigon. Can Tho and Saigon. Phnom Penh (Cambodia). In the new near-term plan associated with the vision, it can be seen that throughout the Mekong Delta region, the government devotes resources and focuses on growing the transport chain and infrastructure, especially the highway chain, to promote traffic. trade and economic development for the population.
The province's transportation infrastructure has been monitored and arranged uniformly. In the 2021-2025 period, An Giang invests in important transportation infrastructure, especially provincial roads and national highways, to develop and promote the province's leading economic sectors. evolution. For Chau Doc - Can Tho - Soc Trang Avenue, when completed, it will be combined with the investment scale of the route connecting National Highway 91 and Ho Chi Minh City bypass. Long Xuyen, participating in promoting movement from An Giang to the capital of the Southwest and Saigon. Saigon.

Binh Hoa Industrial Park is located in Binh Hoa commune, Chau Thanh district, An Giang province; Geographical location: Lo Lo intersection, next to national highway 91 and provincial road 941, in Chau Thanh, An Giang province. Far from Saigon. Saigon 205km. Far from Ho Chi Minh City. 15km from Long Xuyen, 41km from Chau Doc town, 67km from the economic zone attached to Tinh Bien global border gate and 20km from My Thoi port. Prime location for waterway transportation and located right in the capital of the Long Xuyen Quadrangle agricultural raw materials area, making the project area a trade center between regions, providing quick access. many areas.
Binh Hoa Industrial Park is well-invested in modern infrastructure, electricity, water, and utilities to help workers experience a modern, comfortable working space:
Traffic: paved with hot asphalt concrete twelve centimeters thick, with main roads 21 m wide and secondary roads 9 m wide.
Electricity: The electricity distribution chain is taken from the national grid system with a capacity of 110/22kv.
Water: water distribution chain with capacity of 1, 600m3/day from Phan Thiet's water workshop is always committed to distributing enough water to workshops and workshops in the infrastructure.
Wastewater treatment: wastewater treatment workshop with capacity of 6,000m3/day and night, of which 1: 2,000m3/day and night has been put into operation. Organize the behavior in column b - QCVN 40: 2011/btnmt standards, the investment wastewater treatment workshop of the industrial park treats discharged water in column a - QCVN 40: 2011/btnmt criteria.
Information system: the infrastructure is built with a state-of-the-art telecommunications system that meets global standards to fully and quickly meet all requirements for domestic and international communication solutions.
External amenities of Binh Hoa Industrial Park project
With a prime location, Binh Hoa Industrial Park provides quick regional connectivity, easy and convenient trade links, helping everyone to use external amenities at any time:
- WORKER HOUSING AREA OF BINH HOA INDUSTRIAL PARK 1km
-Tri Ton Junction - Chau Doc (An Giang 1.1km
-An Chau Market 5.4km
-Phan Thanh Long Secondary School 7.3km
- An Chau town 6.3km
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Management Board of Industrial Parks of An Giang province | |
| Location | Chau Thanh district, An Giang province | |
| Acreage | total area | 131.75 |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 2012 | |
| Current investors | ||
| Main job | Production and processing of sports shoes and garments; Producing animal feed, plastic, consumer goods; Processing agricultural - aquatic - livestock products; food, vegetables; Mechanical professions manufacturing machinery and equipment; | |
| Occupancy | 73% | |
| LOCATION & DISTANCE: | ||
| Road | Long Xuyen city center: 15km | |
| Air | ||
| Train | ||
| Sea port | My Thoi port: 20km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 80MVA | |
| Clean water | Wattage | |
| Highest capacity | 10000/ngày | |
| Waste water treatment system | Wattage | 6000/ngày |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factory | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | annual | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |